The Schwartz Road Bridge is a single-lane bridge with a high volume of truck traffic since it leads to the City’s solid waste landfill. Proudfoot Associates, Inc. designed a replacement structure for the bridge in 2010.
The design featured a single span, 120 foot long prestressed concrete box beam superstructure, with capped pile abutments and deck width of 28 feet. A Corps of Engineers Nationwide Permit was required, as well as a flood plan permit. The project was constructed in 2011.