Plans and specifications were prepared for the total reconstruction of one mile of Fort Meigs Road from Roachton Road to Eckel Junction Road, along with the construction of a ten-foot-wide, paved, shared use path parallel to the roadway.
Designs were completed in 2007, 2008 and 2009. Phase 1 was constructed in 2008, with Phase 2 built in 2009 and Phase 3 in 2010.