Proudfoot Associates designed a single span 60-foot long, prestressed concrete box beam superstructure on semi-integral abutments on spread footings. The design was accomplished in five months, to ensure 2013 construction to occur.

Pemberville Road Bridge (1)The bridge and roadway approaches were raised to clear the 25 year high water. The bridge has an 18 degree skew and is a non-composite design. Construction was completed in November 2013.