In Jerry City, Ohio, Proudfoot Associates designed a single span, 54-foot long prestressed concrete box beam superstructure on semi-integral abutments on piling.

Jerry City Road (2)The design was accomplished in 6 months, to ensure 2012 construction to occur. The bridge features a 40 degree skew and a 28-foot wide deck. Construction was completed in December 2012.