Roadway design
plans and specifications were prepared for the milling and resurfacing of 2
miles of Village streets. The project included pavement and curb repair at
select locations, 2,528 square feet of new sidewalk with 35 curb ramps,
storm sewer work, lawn restoration, pavement markings, and signage. The
design also involved the replacement of 3,832 feet of 4-inch through 12-inch
water main with 55 new service connections. The project was constructed in
2007 at a construction cost of $966,139. |
 |